IPS HEALTH, SAFETY, ENVIRONMENT |
|
| IPS recognizes that the success of the organization begins with an uncompromising commitment to the well-being of employees, contractors, customers and the environment. Every employee at IPS is responsible and accountable for maintaining the highest standards of health, safety and environmental compliance. IPS is striving to achieve an incident-free workplace by: |
- Listening to and learning from its employees, contractors and customers
- Identifying potential hazards and ensure processes and procedures are in place to manage risks
- Creating a culture of continuous improvement
- Maintaining accurate information on performance and compliance
|
| 2007 Company Initiatives & Objectives |
| Training |
| Safety |
| Environment |
|
| IPS 2007 Initiatives & Objectives |
- Achieve TRIR < 2.0
- Achieve TVAR < 4.0
- Achieve LTIR < 0.55
- 100 % Implementation of Behavioral Based Safety Program, DOT Compliance Program and Defensive Driver’s Training.
- 100 % Implementation of Storm Water Pollution Prevention Plans
|
Training |
- Leadership Training for Managers and Supervisors
- Driver Training for DOT Governed Personnel
- Incident Investigation Training
- Cause Analysis Training
- Safety Awareness Presentations by Management to all personnel
- Increased Field Presence and Location Audits by HSE Coordinators
- Standardization of Employee Based Training
- Explosive and Radiation Training for Electric Line personnel
|
Safety |
| Initiatives to Reduce LTI: |
- Incident investigations conducted on injuries, accidents, near misses or other incidents to define causes and corrective actions
- Pre-job safety meetings and Job Safety Analyses conducted before the start of operations to identify hazards associated with the job, jobsite, or other activities
- Internal HSE audits will be performed on mapped processes to determine compliance with hazard identification and risk analysis plans
- Assign safety coordinators at the location level
- DOT Compliance Reviews
- Safety Awareness Presentations by Management to all personnel
- Increased Field Presence and Location Audits by HSE Coordinators
- Increased Distribution of Safety and Technical Alerts
- Development of Field Safety Manual
|
| Our Continuous Improvement Process drives our proactive
Health, Safety, and Environmental Programs: |
- Safety Training
- Pressure control, Explosives, Driving, etc.
- Improved Efficiencies through engineering
- Hydraulic grease injection with BOP control
- Reduced Environmental Impact
- Safer Working Environment
- Managed Risk Analysis Process
- Review of Storm Water Prevention Plans for Each Facility
- Review of Spill Prevention and Control Plans for Each Facility
|
|
IPS has achieved the following Workers' Compensation Experience Modification Rates (EMR) |
|
|
Environment |
| |
The IPS Green Flowback process is an efficient process to separate, record and sell produced effluent constituents. This closed loop system beginning with the completion phase allows the well operator the advantage of hydrocarbon sales during this workover process.
|
How it Works |
- Temporary staged frac plugs are drilled via coiled tubing, snubbing or workover rig.
- Produced fluids and plug cuttings enter flowback system.
- Large solids are captured and removed from fluids.
- Produced fluids enter manifold and separator system for rate and pressure control.
- Sand particles are then captured and removed from produced fluids.
- Hydrocarbons are separated and directed to sales line.
- Hydrocarbons are sold during entire drilling process
|
Benefits of the IPS Green Flowback Process |
- Recognized by “Energy Star Program”
- No Flaring – No Venting
- Reduced Methane Emissions
- Environmentally Friendly
|
Able to sell Hydrocarbons during completion drillouts |
- Capture and remove large produced solids
- Capture and record produced hydrocarbons
- Comprehensive well testing to predict well and field productivity
|
Eliminates well shut-in time |
- Reduces debris fallback on top of BHA
- Reduces plugging of hydraulic manifold
- Reduces differential sticking of BHA
- Minimal or no formation damage
- Eliminate loading hole with kill fluid
|
|