U.S. Services | Canada Services | International Services
Coiled Tubing
Corporate Profile | Health, Safety & Environment | Contract Terms | Contact Us
Hydraulic Swabbing
Open and Cased Hole Logging
Pressure Pumping and Nitrogen
Pressure Testing
Production Testing
Plunger Lift & Swabbing
Slickline
Snubbing / Hydraulic Workover
Tubing Conveyed Perforating

SNUBBING / HYDRAULIC WORKOVER

IPS specialists are experts at Hydraulic Workover and Live Well Snubbing operations; with extensive experience employing the latest technology to deliver reliable Workover and Completion results. Our specialists also use hot-tapping, valve-drilling and freeze equipment to meet each client's unique needs.
Snubbing and Hydraulic Workover are versatile and cost-effective alternatives to other completion and workover systems. These applications can be used both onshore and offshore and eliminate the need for kills fluids which, in turn, reduce formation damage. The IPS team incorporates engineering expertise and operational knowledge in the design and implementation of every job to ensure production enhancement objectives are met.
In addition to eliminating the need for kill fluids, other benefits of "live-well" operations include:
  • Ability to conduct operations under pressure
  • Designed to work with pressures from 0 psi to over 15,000 psi
  • Small footprint on location
  • Fast rig-up and rig-down
  • Ability to rotate tubulars
Snubbing & Hydraulic Workover Applications
Snubbing & Hydraulic Workover Equipment
Creating Customer Value
Snubbing & Hydraulic Workover Applications
  • Under-Balanced Completions
  • Well Recovery
  • Snubbing Tubulars In and Out of Wellbores
  • Acidizing and Cementing Under Pressure
  • Setting Packers and Plugs
  • Hydraulic Stimulation
  • Zonal Isolation
  • Tubing Conveyed Perforating
  • Reservoir Drilling
  • Milling Plugs and Packers
  • Running Isolation Packers
  • Live-Well Fishing Operations
  • Wellbore Repair
  • Running Kill Packers
  • Lateral Drilling
  • Well Deepening and Sidetracks
  • Plug and Abandonment
  • Offshore Recompletions
  • Offshore Tubing replacements
  • Underground Blowouts
  • Well “Kill” Requirements
  • Running Tubulars During Kicks
Snubbing & Hydraulic Workover Equipment
LIFT CAPACITY 170,000 LBS. 150,000 LBS. 225,000 LBS. 460,000 LBS.
SNUBBING
CAPACITY
94,240 LBS. 65,970 LBS. 120,000 LBS. 220,000 LBS
TUBING RANGE 1” TO 5 - 1/2” 1” TO 3 - 1/2” 1” TO 5 - 1/2” 1” TO 7 - 5/8”
ROTARY TABLE
TORQUE
PASSIVE ROTARY 3,000 FT. LBS 5,500 FT. LBS. 7,500 FT. LBS.
JACK STROKE 10 FEET 10 FEET 10 FEET 10 FEET
JACK THRU BORE 7 - 1/16” 7 - 1/16” 11” 11”
DATA ACQUISITION YES YES N/A N/A
Creating Customer Value
Customer Challenge
Our customer had a well with two reservoir zones. The upper zone of well had flowed for two years, resulting in BHP at 4,200 psi. The lower zone below a composite bride plug had virgin BHP of 11,500 psi. The customer needed to safely and efficiently remove the bridge plug and came to IPS for a solution.
IPS Solution
IPS Engineers analyzed the well conditions and determined snubbing unit was the appropriate solution to drill out bridge plug. They also recommending using the IPS Green Flowback Process to sell gas while tripping pipe and drilling the bridge plug. During the tripping operation - gas produced at 2mmscf/day, during the drilling operation - gas produced at 5 mmscf/day.
Customer Value:
  • The composite bridge plug was safely and efficiently removed from the well
  • The well was not shut in or loaded with fluids
  • No formation damage was incurred
  • The customer sold gas through entire process
  • 23 mmscf of gas was sold during the process - not flared or vented
  • <<Top
     
    IPS - 3700 BUFFALO SPEEDWAY SUITE 620, HOUSTON, TX 77098 HOME | SITE MAP © 2009